Construction of a 30-meter-high steel structure with enclosures for the installation of a new evaporator. Project carried out in collaboration with the engineering firm Idom.
Strategy
2019
2019
Client
IPSUM ZARAGOZA
IPSUM ZARAGOZA
Construction of a 30-meter-high steel structure with enclosures for the installation of a new evaporator. Project carried out in collaboration with the engineering firm Idom.